HEREBY INFORM OUR CUSTOMERS THAT WE ALREADY RENAMED JINERJIAN TIANJIN VALVE CO., LTD. TO HENAN BUNDOR FLOW CONTROL CO., LTD. FROM APRIL 1ST. 2015

Why Choose Us

 Operation advantage 
• Select the right suppliers to perform the order 
• Support clients to get the order; 
• Deliver the order products on schedule; 
• Deliver with required quality; 
• Provide logistics service; 
• Provide whole Manufacturing Data Records (MDRs)
 
Project Supporting Advantages  
• Review the project technical specifications for inquiries 
• Prepare the project TDS (Technical Data Sheet) for pricing 
• Estimate the feasibility of the manufacturing 
• Allocate the proper qualified suppliers for the inquiry 
• Estimate the delivery time and schedule 
• Provide the mill’s qualification documents if required
• Prepare full tender documents including MPS, ITP, WPS, Painting procedures 
 
Quality Management Advantages  
•Handover meeting to make operation team fully understand requirements before production 
•Production Kick off meeting to the mill fully understand the requirements 
•Experienced Engineer to assist the mill on technical issue
•Qualified QC inspectors full time supervision for special request 
•Specific WIs, Forms, Records in place
•QC Daily detail report
•Material re-test and heat No. tracking system 
•3rd party inspection if needed
•Final inspection before delivery
•Loading survey report after loading 
 
Production Control Advantages 
•Supplier manufacture capacity evaluation
•Specific working scope and standards
•Production plan and schedule
•Monitor progress
•Technical support for mill manufacturing
•Packaging method developing  
•Variation control
 
Logistics 
•experienced shipment management 
•stowage plan and Shipment booking  
•Inspection and reports
•Collecting shipping documents and insurance
•Custom clearance 
•Full time loading survey 
•After shipment, keep update the ETD to clients
 
Documentation
•Bill of landing, Commercial Invoice, Packing list , Insurance, MTC, CO .Raw material mill test , process records, NDT report, welding report, heat treatment chart and so on all the traceability documents
 
Our main end user
  •  
  •